we have been operating on the design and construction services market of the railways industry since 1988

Out headquarters

ul. Arki Bożka 25, 41-902 Bytom

Fundusze Europejskie

Reconstruction of the railway traffic control system devices in DTC and DTA signalling controls

On 31.08.2017, Elkol – Prvni Signalni a.s. Consortium signed a final acceptance protocol for the following task: “Reconstruction of the railway traffic control system devices at DTC and DTA signalling controls and recreation of Okradzionów junction signal box including reconstruction of the track system and the overhead contact line in Dąbrowa Górnicza Towarowa station as a part of the following investment project: “Works at south-eastern GOP bypass including adjacent sections at level crossings no. 154, 171, 661”

As a part of the investment, works for the following industries have been executed:

The railway traffic control system industry:

  • Dąbrowa Górnicza Towarowa station, DTA signalling area,
  • Dąbrowa Górnicza Towarowa station, DTC signalling area,
  • Dąbrowa Górnicza Towarowa station, DTB signalling area,
  • Dąbrowa Górnicza Towarowa station, DTB 11 signalling area,
  • Kozioł junction signal box,
  • Przemiarki junction signal box.

The track superstructure:

  • Dąbrowa Górnicza Towarowa station
  • Okradzionów junction signal box

Electrical power engineering industry:

  • Okradzionów junction signal box
  • Dąbrowa Górnicza Towarowa station, DTA signalling area,
  • Dąbrowa Górnicza Towarowa station, DTC signalling area.

Overhead contact line:

  • Line no. 154,
  • Line no. 661 Okradzionów – Kozioł.

Telecommunication engineering industry:

  • Reconstruction of PKP cables Maintenance of DTA signalling control,
  • Reconstruction of PKP cables Maintenance of DTC signalling control,
  • TVU SKP telecommunication and monitoring at previous Okradzionów post,
  • Construction of TVU for SKP,
  • Construction of a fibre optic cable,
  • Construction of a copper cable,
  • Extending of pairs from the existing copper cable.

General construction works:

  • Demolition of DTC signalling controls including clearing of the area,
  • Demolition of crossover station no. 12 including clearing of the area,
  • Construction of a technological container at 15.120 km within the area of Okradzionów junction signal box in order to install railway traffic control system devices in the container,
  • Demolition of old DTA signalling control,
  • Construction of a building of DTA signalling control at 17.360 km including finishing works and equipment
Contact us

ul. Arki Bożka 25,
41-902 Bytom

tel. 32 438-19-01

e-mail: elkol@elkol.pl

Video conference:
vc@elkol.onmicrosoft.com

Regon: 008135550

NIP: 634-019-83-17