On 25.10.2016, Consortium of Elkol and KZA Przedsiębiorstwo Automatyki i Telekomunikacji Sp. z o.o. signed an agreement with PKP Linia Hutnicza Szerokotorowa Sp. z o.o. on execution of works as a part of the following tasks: “Installation of computer railway traffic control system devices at Sławków LHS station”
As a part of the investment, we execute the following works:
- Construction of the signalling controls building including accompanying infrastructure,
- Installation of computer railway traffic control system devices and crossing devices for cat. A crossings located at the station,
- Construction of Sławków LHS – Bukownie LHS block signalling,
- Construction of the station lightning,
- Construction of tracks no. 16a, 32a, 315 and 302a including drainage system,
- Construction of telecommunication engineering cable ducts including a fibre optic cable connecting the building of the new signalling controls with the administration building,
- Construction of the turnouts electrical heating,
- Construction of a cable duct for the power, telecommunication engineering and railway traffic control system cables,
- Construction of TVU closed-circuit television system,
- Construction of a redundant power source.