On 30.12.2016, Elkol signed an agreement with Zakłady Automatyki Kombud S.A. on execution of works as a part of the following task: “Expansion of a local control centre at Zamość – Bortatycze LHS station including construction of tracks for emergency stabling of damaged cars with hazardous goods, track no. 4005, and a water and sewage management system at Zamość Bortatycze LHS station.”
The following works are executed as a part of the implementation:
- in the scope of power industry:
– lightning of the station plain and the holding track,
– turnouts electrical heating system, - in the scope of sanitary industry:
– water and sewage management of: the holding track, water, fire and drainage sewage connection, - in the scope of construction industry:
– foundations for masts and lamp posts.
THE OFFICIAL OPENING OF THE NEW CONTROL CENTRE TOOK PLACE ON 5 MARCH 2018
http://www.rynek-kolejowy.pl/wiadomosci/pkp-lhs-nowy-lcs-zamosc-boratycze-zdjecia-86053.html